Company new

Double Girder E.O.T (Electric Overhead Traveling) Crane

Double Girder E.O.T (Electric Overhead Traveling) Crane - The crane consists of two bridge girders supported on two end trucks. The trolley runs on rails on the top of the bridge girders.

Double Girder E.O.T (Electric Overhead Traveling) Crane

1) Bridge - The main traveling structure of the crane which spans the width of the bay and travels in a direction parallel to the runway. The bridge consists of two end trucks and one or two bridge girders depending on the equipment type. The bridge also supports the trolley and hoisting mechanism for up and down lifting of load.

2) End trucks - Located on either side of the bridge, the end trucks house the wheels on which the entire crane travels. It is an assembly consisting of structural members, wheels, bearings, axles, etc., which supports the bridge girder(s) or the trolley cross member(s).

3) Bridge Girder(s) - The principal horizontal beam of the crane bridge which supports the trolley and is supported by the end trucks.

4) Runway - The rails, beams, brackets, and framework on which the crane operates.

5) Runway Rail - The rail supported by the runway beams on which the crane travels.

6) Hoist - The hoist mechanism is a unit consisting of a motor drive, coupling, brakes, gearing, drum, ropes, and load block designed to raise, hold, and lower the maximum rated load. Hoist mechanism is mounted to the trolley.

7) Trolley - The unit carrying the hoisting mechanism which travels on the bridge rails in a direction at right angles to the crane runway. Trolley frame is the basic structure of the trolley on which are mounted the hoisting and traversing mechanisms.

CONTACT US

Contact: Bruse Skype:nucleoncranegroup

Phone: WhatsAPP:008618637120986

Tel: 0086 371 65657585

Email: info@nucleoncranegroup.com

Add: Crane Industrial Park, Changyuan County, Henan Province, China