Science and technology

The technical parameters of electric hoist Overheadcrane

The technical parameters of electric hoist Overheadcrane

Overheadcrane

The electric hoist Overheadcrane has two roles ( independently used , cooperated with large machine as main hoisting accessory ) , and the electric hoist Overheadcrane is small in structure and convenient to operate . The quality of installation is the prerequisite for ensuring the good working condition of the later equipment, Whether the installation is in place determines its service life.

The installation process matters that should be paid attention to:

In order to prevent the electric hoist Overheadcrane from running to the end of the rail during running , the rail does not appear to be out of orbit or is a collision damage body, Then we should install some buffers at both ends of the track to absorb the impact.

In order to ensure the safety of power supply , the grounding wire shall be provided . Before installation , check whether the parts are damaged or defective . If you find should be timely repair or replacement. The process of installation shall be carried out in strict accordance with the operating procedure requirements, Operators should enhance their consciousness of security to maintain a zero tolerance attitude of potential safety concerns.

It is very necessary to check and accept the first installation of the equipment, both in a safe and economic perspective. Our main inspection items include the following points :

Check if the parts are damaged in the installation link, the wiring connection of the electrical equipment is safe and reliable,  whether some malfunction or abnormal fault in the safety protection device. Whether the key parts are lubricated in place, whether the wheel and the track are safe and reliable.

CONTACT US

Contact: Bruse Skype:nucleoncranegroup

Phone: WhatsAPP:008618637120986

Tel: 0086 371 65657585

Email: info@nucleoncranegroup.com

Add: Crane Industrial Park, Changyuan County, Henan Province, China