The using steps of Monorail Overhead Crane

The using steps of Monorail Overhead Crane

Monorail Overhead Crane

1. When the Monorail Overhead Crane starts up, close to the Monorail Overhead Crane or someone on it, a warning signal must be issued.

2. Must be concentrated, prohibit the use of reading, eating, telephone, chat and so on.

3. First empty trolley start the institutions, to determine whether the normal operation of the agencies.

4. "Steady, accurate, fast, safe operation, reasonable" always be steady, steady, steady fall

5. You must obey the command signal, and the driver is not allowed to drive unless the signal is unknown or the conductor is not out of danger zone;

6. The driver only listens to the driving signal issued by the designated commanding officer, and any parking signal must stop immediately.

7. Although the commanding officer gives the command signal, he should not drive when he does not pay attention to the hanging objects.

8. The controller of the Monorail Overhead Crane should be added (reduced) speed, and the control handle should not be transferred from the forward position to the reverse position as the parking (only in special circumstances).

9. During the operation, if you hear a unusual sound, should immediately stop check off, lifting objects should be safe down.

10. In the work of the Monorail Overhead Crane, encountered a sudden power outage or line voltage drop sharply, the controller should be back to zero as soon as possible, cut off the power switch, and notify the commander.

11. The hoisting mechanism brake suddenly failure at work, must be calm, if necessary turn controller at low speed, slow repeated lifting, moving at the same time a cart or trolley, to choose the security zone, to lay down heavy

12. When the vehicle loses control, the trolley should be hit according to the situation or press the emergency stop button.

CONTACT US

Contact: Bruse Skype:nucleoncranegroup

Phone: WhatsAPP:008618637120986

Tel: 0086 371 65657585

Email: info@nucleoncranegroup.com

Add: Crane Industrial Park, Changyuan County, Henan Province, China