There are 6 points need to pay attention to in the Overhead Crane Equipment operation

There are 6 points need to pay attention to in the Overhead Crane Equipment operation

 Overhead Crane Equipment

a. Also check the rope, must confirm that the rope is solid, not loose or broken. If the object is tied with a prism, it is necessary to add a shield between the object and the rope to avoid the rupture of the rope.

b. Before the operation of the Overhead Crane Equipment, the lifting tools must be checked to ensure the integrity of lifting tools. If the crane is defective, the crane can not be operated.

c. Need to pay attention to identify the center of weight, The phenomenon of oblique pulling can not occur, and the special lifting materials need to be operated by the staff.

d. Safety measures should be improved, For example, the staff wear helmets, professional staff should be unified command , All departments should coordinate work. When the object is away from the ground, it is necessary to check the safety of the wire rope and other parts. If it's unsafe, check it out.

e. When the Overhead Crane Equipment carrying objects cannot act with undue haste, must wait for a moment to be stable after the goods can continue. Above weight is not allowed to put sundry, also not allowed to stand. When hoisting, below the objects it may not have the independent staff through.

 f. The use of Overhead Crane Equipment can not make objects in the air for a long time to stay.

CONTACT US

Contact: Bruse Skype:nucleoncranegroup

Phone: WhatsAPP:008618637120986

Tel: 0086 371 65657585

Email: info@nucleoncranegroup.com

Add: Crane Industrial Park, Changyuan County, Henan Province, China