Industry new

Overhead Crane Brake System

QD Model Double Beam Overhead Crane Brake System

Overhead cranes sometimes also called bridge cranes and eot crane, which are cranes with a hoist or winch traveling along the bridge between parallel runways. They are designed to meet the medium to heavy industrial lifting requirements, covering all parts of the manufacturing process. Compared with single girder overhead crane, the double bridge overhead crane can support bridge lift capacity, and more suitable for heavy work duty.  

QD Model double beam overhead crane drawing

 QD Model Double Beam Overhead Crane Brake System Technical Parameters:

QD double beam overhead crane

Lifting Capacity   T

5

10

16/3.2

20/5

25/5

32/5

50/10

400/80

Span  M

10.5-31.5

28

Lifting height M

Main Hook

16

16

16

12

12/11.0

16

12

22

 

Aux Hook

 

 

18

11

14/13

18

16

24

Speed  M/min

hoist

Main hook

A5

12.5

8.5

7.9

7.2

7.3

7.8

5.9

2.92

 

 

 

A6

15.5

13.3

13

9.7

9.8

9.5

7.8

 

 

 

Aux hook

 

 

 

14.5

12.7

12.7

19.5

13.2

9.24

 

Trolley travelling

37.2

43.8

44.6

44.6

37

42.4

38.5

37.2

 

Bridge travelling

A5

89.8 /92.3

89.8-91.9

84.7-87.6

84.7/ 87.6

85.5/88

74.2-87.6

74.6

25.9

 

 

A6

116.2/ 117.4

112.5-116.8

112.5

112.5/ 101.4

112/ 101.4

86.8-101.4

87.3

 

Weight  Kg

Trolley

A5

2126

3424

6227

6856

7185

10877

15425

142.3

 

 

A6

2224

3562

6427

7180

7856

11652

15765

 

 

Total Weight

A5

12715-31405

14270-34405

19128-39428

19947-41497

20795-42796

26901-52748

35317-64880

359000

 

 

A6

12991-31596

14719-34699

20045-41315

20984-44225

22632-16324

28061-55272

36075-67242

 

Max Wheel Load KN

A5

74-125

102-160

141-205

163-231

185-255

237-327

333-450

7500

 

A6

75-126

104-162

145-211

167-239

189-263

242-335

336-457

 

Rail recommended

Trolley

15kg/m

43kg/m

 

Bridge

43kg/m

QU70

QU80

QU120

Power Source

According to your demand

Safety Devices for overhead crane:

Overhead Crane Brake System

To guarantee the normal operation of crane and avoid the personal casualty and mechanical damage, the safety device we provide are not only the electric protective devices or alarm bell but also other equipments as following:

1.Overload Limit Switch

2. Rubber Buffers

3.Electric Protective Devices

4.Emergency Stop System

5.Voltage Lower Protection Function

6. Current Overload Protection System

7. Rail Anchoring

8.Lifting Height Limit Device

CONTACT US

Contact: Bruse Skype:nucleoncranegroup

Phone: WhatsAPP:008618637120986

Tel: 0086 371 65657585

Email: info@nucleoncranegroup.com

Add: Crane Industrial Park, Changyuan County, Henan Province, China