Science and technology

Electric Hoist Lifting Overhead Cranes

Electric Hoist Lifting Overhead Cranes

LH double girder overhead crane is composed with Girder frame, Crane travel device, and the trolley with lifting and moving device. There are Pave the rail for the trolley move on the main girder.

Assemble the moving table on the outside of the two main girder, one side is prepare for the assemble and maintenance the crane move device, another side is prepare for the assemble of the trolley conductor device.

Electric Hoist Lifting Overhead Cranes

There are full field of view Cabin suspend under the main girder, there are joint control desk or single control box packed within the Cabin, assemble the sidelong ladder between the Cabin and moving table, The main girder joint with the two side end carriage which with the joint point in the middle.

Electric Hoist Lifting Overhead Crane

The capacity:2-30ton

The span:7.5-31.5m

The working grade:A3-A5

The working temperature:-25 to 40

CONTACT US

Contact: Bruse Skype:nucleoncranegroup

Phone: WhatsAPP:008618637120986

Tel: 0086 371 65657585

Email: info@nucleoncranegroup.com

Add: Crane Industrial Park, Changyuan County, Henan Province, China