QD Double Girder Hook Overhead
Crane is composed with Girder frame,
Crane travel device, and the trolley with lifting and moving device. There are
Pave the rail for the trolley move on the main girder.
Assemble the moving table on the outside of the two main girder, one side is
prepare for the assemble and maintenance the crane move device, another side is
prepare for the assemble of the trolley conductor device.
There are full field of view Cabin suspend under the main girder, there are
joint control desk or single control box packed within the Cabin, assemble the
sidelong ladder between the Cabin and moving table, The main girder joint with
the two side end carriage which with the joint point in the middle.
Double Girder Hook Overhead Crane
Lifting Capacity |
T |
5 |
10 |
16/3.2 |
20/5 |
32/5 |
50/10 |
||
Span |
m |
10.5-31.5 |
|||||||
Speed |
Main Hook Lifting |
A5 |
m/min |
11.3 |
8.5 |
7.9 |
7.2 |
7.5 |
5.9 |
A6 |
15.6 |
13.3 |
13 |
12.3 |
9.5 |
7.8 |
|||
Aux. Hook Lifting |
16.7 |
19.5 |
19.5 |
10.4 |
|||||
Traveling of Crab |
37.2 |
43.8 |
44.6 |
44.6 |
42.4 |
38.5 |
|||
Traveling of Trolley |
A5 |
89.8/91.8 |
90.7/91.9/84.7 |
84.7/87.6 |
84.7/87.6 |
87/74.2 |
74.6 |
||
A6 |
92.7/93.7 |
115.6/116/112.5 |
112.5/101.4 |
112.5/101.4 |
101.4/101.8 |
75/76.6 |
|||
Operational Model |
Cabin; remote control; ground handle |
||||||||
Working Duty |
A5,A6 |
||||||||
Power Supply |
Three-phase A.C. 380V, 50Hz |
Contact: Bruse Skype:nucleoncranegroup
Phone: WhatsAPP:008618637120986
Tel: 0086 371 65657585
Email: info@nucleoncranegroup.com
Add: Crane Industrial Park, Changyuan County, Henan Province, China